CENE 437
Syllabus
Schedule
Homework






HelpStartSyllabusThe ClassLibraryCommunicate
 CENE 437: Syllabus: Assignments


Syllabus

Assignments

(Please NOTE - if there is a discrepancy between the problems listed here and those found within the Class portion of the web site - THIS list of problems supersedes any problems listed within the Class.)

Only those problems with a designated due date are required (and graded) homework problems. The others are suggested problems, in which solutions will be provided, for the student to use as study aids.

Assignment Name Due Date Problems
Introduction   See questions on module page

Dead and live loads,

HW 1

9/6
  • Dead loads: Breyer, problems 2.3 a-b.
  • Live loads: Breyer, problems 2.3 c, 2.5 a-c.
Snow loads and V & M review  
  • Snow loads: Breyer, problems 2.7, 2.10 a, b
  • V & M review: Breyer, problems 3.1b, 2.16 a-d.
Wind pressure and building stability  
  • Wind pressure: Breyer, problems 2.19, 2.20.
  • Stability: Breyer, problem 2.18
Wind analysis, HW 2 9/20 Breyer, problem 3.4a and d only (except use Method 1) and 3.8 (except building is partially enclosed and use Method 1).
Base shear   Breyer, problem 2.22 a-e
Seismic analysis 1, HW 3 -9/27 Breyer, problem 3.14 a-d
Seismic analysis 2   Breyer, problem 3.13 a-d
Load Combinations   See questions on sub-module page.
Solid-Sawn, HW 4 10/4 Breyer, problems 4.4, 4.6, 4.8, 4.10, 4.14
Wood beams, Other Types   Breyer, problems 5.1, 5.3, 5.7, 5.8, 5.9
Adjustment Factors, HW 5 10/11 Breyer, problems 4.31(except use No. 2 Doug-Fir Larch and complete bending stress only, assume full lateral support), 5.12, 5.17
Bending - Wood, HW 6 10/16 Breyer, problems 6.12 (bending only and lu = 10'), 6.28 (ignore beam self weight - focus on finding the allowable concentrated load)
Shear, Deflection, Bearing, HW 7 10/18 Breyer, problems 6.12 (everything else), 6.32

Beam Design - Wood, HW 8

Skip this homework - solutions will be provided

*****

 

Breyer, problems 6.23, 6.35 c only
Introduction to Structural-use Panels   Breyer, problems 8.2, 8.8, 8.10, 8.12, 8.16
Sheathing Design, HW 9 10/30 Breyer, problems 8.19, 8.20
Diaphragm 1, HW 10 11/1 Breyer, problem 9.1 (Also check sheathing for vertical loads.)
Diaphragm 2, HW 11 11/3 Breyer, problem 9.9 (Also check sheating for vertical loads.)
Masonry   Schneider and Dickey, problems 1-11, 1-12, 3-2, 3-4, 3-6, 3-17, 4-6, 4-16, 4-22, plus masonry assembly strength questions
Bending Analysis - Masonry Beams, HW 12 11/15 See question on Bending topic page
Bending Design - Masonry Beams, HW 13 11/20 See questions on Bending topic page
Shear Design - Masonry Beams, HW 14 11/20 See questions on Shear topic page
Masonry Walls, Bending - Analysis   See question on Masonry Walls, Bending topic page
Masonry Walls, Bending - Design, HW 15 11/29 See question on Masonry Walls, Bending topic page
Masonry Walls, Axial, HW 16 12/1 See question on Masonry Walls, Axial topic page

 



Project Assignments

These project assignments are intended to help you move though the design of a single-story building in a logical manner. Your final project is due at the end of the semester and will incorporate these assignments. It is important to correct any mistakes in each project assignment prior to moving on to the next project assignment. Refer to the project area for further information.

Activity Due Date
Gravity Loads 9/13
Wind 9/25
Seismic 10/13
Wood Beams 11/3
Wood Diaphragms 11/13

For more project information see the Project Schedule.




Send Email to Deb Larson at Debra.Larson@nau.edu


Web site created by the NAU OTLE Faculty Studio
NAUCopyright 1998 Northern Arizona University
ALL RIGHTS RESERVED