A process used to identify gaps between company A's performance and other industry "best practices," is the definition for:
Your answer:
Which ONE of the following is NOT a category of needs assessment information?
Your answer:
predictions of past participation
attitudes of consumers
demographic data
health hazard appraisal
A SWOT analysis chart is used in which step of the planning process?
Your answer:
Step 2
Step 6
Step 4
Step 1
Which ONE of the following is NOT an example of a single-use plan?
Your answer:
operation
projects
programs
budgets
A decision-making process that promotes changes that will accommodate new needs and search for ways to improve existing conditions, is the definition for:
Your answer:
Which ONE of the following should NOT be included as a member in a Program Committee?
Your answer:
construction representative
end user
management representatives
program specialists
Detailed planning (master plan) begins with all of the following concurrent studies EXCEPT:
Your answer:
identification of capital improvements
analysis of existing conditions
activity program review
development of an organizational profile
In a master plan, a projected capital improvement list would cover a ______ year period.
Your answer:
5
10
3
7
The most important aspect of site selection is:
Your answer:
availability of utilities
location
size of parcel
zoning
Any work that needs to be completed by the contractor prior to a final inspection, is called a:
Your answer:
special list
as-built list
punch list
pre-inspection list
The central and most critical member in the facility planning and design process is the:
Your answer:
interior designer
program specialist
architect
facility consultant
Which ONE of the following is NOT a factor determining the selection an architectural team?
Your answer:
company reputation
company experience
formal review process
appointed by the State Building Commission
An official document requested by either the contractor or the contracting agency that changes the approved contract documents is called a:
Your answer:
as-built order
scoping document
change order
performance bond
A construction approach that places the responsibility of the project on the architect and builder who work for the same company is known as:
Your answer:
fast tracking
construction management
design and build
lump sum contract
RFQ stands for:
Your answer: